product cost estimate header. stores the header data for standard cost estimates, including material, plant, costing type, lot size, and costing dates. central table for product costing in co-pc.
co18f · 5k · 6r
Unchanged in S/4
Product costing tables (KEKO, KEPH) remain largely unchanged in S/4HANA. The costing engine continues to use these tables for standard cost estimates.
key differences:
  • •No structural changes in S/4HANA
  • •Material Ledger is mandatory in S/4 which affects how cost estimates interact with actual costing

fields (18)

fieldtypelengthkeydescription
KADKYdats8pkcosting date (valid-from date for the estimate)
KALNRnumc12pkcost estimate number (unique identifier for this estimate)
MANDTclnt3pkclient
STLANchar2pkbom application (pp01=production, etc.)
TVERSnumc2pkcosting version (01=standard, 02=modified, etc.)
ERDATdats8date cost estimate was created
ERNAMchar12created by user
FRGKZchar1release indicator (x=estimate released as current standard price)
GESAMTcurr15total cost of estimate
KALKAchar2costing type (01=standard, 06=modified, etc.)
KLVARchar4costing variant
KOKRSchar4controlling area
LOSGRquan13costing lot size
MATNRchar18material number
MEINSunit3base unit of measure
MKFLAGchar1marking indicator (x=estimate is marked as future standard)
WAERScuky5costing currency
WERKSchar4plant

relationships (6)

header / item

parent-child document structure

references
KEPH
KALNRKALNR
KADKYKADKY
TVERSTVERS
1:N
referenced by
KEPH
KALNRKALNR
KADKYKADKY
TVERSTVERS
1:N
master lookup

reference to master data

references
MARA
MATNRMATNR
1:N
configuration

reference to config tables

references
TCURC
WAERSWAERS
N:1
T001W
WERKSWERKS
N:1
TKA01
KOKRSKOKRS
N:1